Talmon Development Documents
This page is dedicated to the Talmon Development at 306 Center Street. Please click on the tabs below to access various document links that are associated with each tab title.
You are welcome to contact Town Hall with questions and concerns, but you are also welcome to contact the Faber Construction Project Manager Eric McDaniel.
Eric McDaniel - Project Manager
Office: 360-354-3500
Mobile: 360-599-7250
Email: eric@faberconstruction.com
- Record Docs
- Ecology Cleanup Docs
- Hearing Examiner Docs
- Reconsideration Docs
- Misc. Docs
- Applicant submittal October 17 2023
- Project Information 2024/2025
BP23-30FG Talmon Development Fill and Grade Approved Permit (PDF)
BP23-30FG Talmon Development Fill and Grade Application (PDF)
Summary of Soil Analysis Report March 2023 (PDF)
Soil Analysis Report March 2023: Full Report (PDF)
Interim Soil Cleanup Report May 2003
Subsurface Investigation Report August 2005
Underground Storage Tank (UST) Removal & Site Assessment May 2003
Hearing Examiner Decision 2.8.2023
Hearing Examiner Meeting Recording December 2022
LU21-56CU Atkinson Staff Report to Hearing Examiner
LU21-56CU Atkinson Supplemental Staff Report to Hearing Examiner
LU21-56CU Atkinson Supplemental Staff Report #2 to Hearing Examiner
All Comments - Atkinson Dev. 306 Center St.
Applicant Letter to Hearing Examiner April 2022
Applicant Submittal October 17 2023
- 21098 - Drainage Memo (PDF)
- 21098 - USDA Web Soil Survey Report - Include with Building Permit (PDF)
- BP23-44B-F 306 Center St (PDF)
- BP23-45F 306 Center St (PDF)
- BP23-46FG 306 Center St (PDF)
- Civil Permit Plan Set 09.26.23 (PDF)
- Civil Permit Plan Set 09.26.23 18x24 (PDF)
- ESA Checklist 10.04.23 (PDF)
- Impervious-Hard Surface Worksheets 10.04.23 (PDF)
- Landscape-L-1 10.04.23 (PDF)
- Narrative (PDF)
- Simplified Construction SWPPP 10.04.23 (PDF)
- Skagit County Impervious Hard Surface Worksheet (Parcel and ROW) 10.04.23 (PDF)
- The Talmon Architectural Drawings 10.04.23 (PDF)
- The Talmon HVAC Plans 09.22.23 (PDF)
- The Talmon Lighting Layout 09.11.23 (PDF)
- The Talmon One Line (PDF)
- The Talmon Plumbing Plans 09.22.23 (PDF)
- The Talmon Structural Calculations 07.21.23 (PDF)
- The Talmon Structural Drawings 07.21.23 (PDF)
- Transmittal - The Talmon - 306 Center (PDF)
- Vicinity Map 10.04.23 (PDF)
Applicant Submittals in 2024/2025, listed by date
- 1.14.2025 Clarifying Submission - Floor Plans with Elevator Shaft Dimensioned and a stretcher
- 10.21.2025 Talmon Revised Traffic Control Plan and Pedestrian Provisions (PDF)
- 12.20.24 Architectural, Mechanical and Plumbing Comment Response Letter (PDF)
- 12.20.24 Building Permit Revision Submittal (PDF)
- 12.20.24 Comment Response Letter (PDF)
- 12.20.24 Mechanical R1 - Talmon (PDF)
- 12.20.24 Plumbing - Talmon (PDF)
- 12.20.24 Summary Statement of Special Inspections (PDF)
- 12.20.24 The Talmon Architectural Drawings (PDF)
- 12.20.24 THE TALMON LIGHTING COMPLIANCE SUMMARY (PDF)
- 12.20.24 THE TALMON MECH COMPLIANCE SUMMARY (PDF)
- 12.20.24 The Talmon Structural Drawings (PDF)
- 12.20.24 The Talmon Supplemental Structural Calculations (PDF)
- 12.20.24 THE_TALMON_2018_WSEC_Project_Lighting_Requirements_List (PDF)
- 12.20.24 THE_TALMON_2018_WSEC_Project_Mechanical_Requirements_List (PDF)
- 2.09.2025 306 Center Street CA (PDF)
- 3.8.2024 Civil Revision Letter Submission 306 Center St (PDF)
- 3.8.2024 Civil Set Rev1 - Signed Flat Submission 306 Center St (PDF)
- 3.8.2024 Easement Exhibit Package Submission 306 Center St (PDF)
- 3.8.2024 Revised Landscape Plan Submission 306 Center St (PDF)
- 3.8.2024 Talmon - Response to review comments Submission 306 Center St (PDF)
- 3.8.2024 The Talmon Architectural Drawings Submission 306 Center St (PDF)
- 3.8.2024 The Talmon Structural Calculations Submission 306 Center St (PDF)
- 3.8.2024 The Talmon Structural Drawings Submission 306 Center St (PDF)
- 4.5.2024 BP23-44BF Atkinson 306 Center Street Conditional Approval (PDF)
- 5.31.2024 Applicant Civil Revision Letter 2
- 5.31.2024 Talmon - Response to Administrative Determination (PDF)
- 5.31.2024 Talmon Civil Plan Set Revision (PDF)
- 5.31.2024 Talmon Landscaping Plan (PDF)
- 5.31.2024 The Talmon Architectural Drawings (PDF)
- 6.18.2024 Talmon Landscaping Plan (PDF)
- 6.25.24 David Evans and Associates Approved Civil Plans (PDF)
- 9.11.2025 Approved LU25-58ROW 306 Center Street Installation of Utilites (PDF)
- 9.11.2025 Approved LU25-59EST 306 Center Street Installation of Utilites (PDF)
- 9.25.2025 Construction Schedule - The Talmon Development at 306 Center Street (SUBJECT TO CHANGE) (PDF)